UcfSE
Structural
- Dec 27, 2002
- 2,525
When using an all-thread rod system for basic roof uplift, the top plate is under flexure due to the roof member uplift force. If you're using a double top plate and need both 2x members together to resist bending (as composite section), how do you splice the top plate so that you keep moment capacity at the splice? There are details and requirements in building codes for nails each side and splice lengths, but I don't think these are meant to address the top plate as a flexural member.