steakman911
Petroleum
- Jul 11, 2012
- 37
Howdy.
Working with B31.3 piping as well as fired and unfired boilers/vessels/exchangers on a SAGD site in N. Alberta
Can someone please direct me to where in the ASME codes is the stated interval for calibration.? I have always considered the maximum time between claibrations is 1 or sooner depending up service...just like to know where that is stated.
Thank you,
Stk
Working with B31.3 piping as well as fired and unfired boilers/vessels/exchangers on a SAGD site in N. Alberta
Can someone please direct me to where in the ASME codes is the stated interval for calibration.? I have always considered the maximum time between claibrations is 1 or sooner depending up service...just like to know where that is stated.
Thank you,
Stk