NickParker
Electrical
- Sep 1, 2017
- 397
What is meant by TPN MCCB? Does the neutral terminal comes along with the MCCB? In a project where a contract SLD shows a TPN MCCB and my senior says we can provide 3 Pole MCCB and neutral shall be taken from the neutral bus. Now the question is If have a load which requires 3 phase 4 wire, the fourth wire (Neutral) being used just for the control transformer inside that load (Package load), Is it acceptable to provide 3 pole MCCB or do we have to provide TPN MCCB?