Markie55
Civil/Environmental
- Jul 9, 2012
- 1
We have been using sheet flow of various lengths up to the maximum length of 300' per TR-55 for various projects. During a recent review, a question came up regarding the use of the 150-200' sheet flow lengths and the reviewer notes that the NRCS now limits the 1ength to 100'. We use HydroCad which allows up to 300 feet for sheet flow computations. We are not aware of any local agency or any other reviewer that uses the 100 foot limit for sheet flow. The state highway drainage manual also uses 300 foot as the limit for sheet flow. Thoughts?