BZLAM21
Petroleum
- Aug 12, 2020
- 61
Hi,
Does anyone know if there is a regulation, standards, practices (in any country) which allows to evaluate the possibility of routing two products in the same transfer line and the same loading arm?
The situation I am thinking of is that linear alkyl benzene and ethylene will be transferred to the dock which could be used for both products.
At the moment, I am interested to know if this configuration is feasible and should I only consider the risk of contamination as a major constraint please advise.
Best regards.
Does anyone know if there is a regulation, standards, practices (in any country) which allows to evaluate the possibility of routing two products in the same transfer line and the same loading arm?
The situation I am thinking of is that linear alkyl benzene and ethylene will be transferred to the dock which could be used for both products.
At the moment, I am interested to know if this configuration is feasible and should I only consider the risk of contamination as a major constraint please advise.
Best regards.