I have a question regarding transformer neutral earthing in IEC land,
(1): Should the transformer Neutral and the transformer frame along with other substation equipment's/structures be interconnected and earthed in substation? or
(2): Should the transformer neutral and the frame be separately earthed and brought to the Main switchboard and interconnected via Link only at the Main switchboard? The neutral and the earth is not connected anywhere else.
I have seen lot of earthing done as per (1) and it seems (2) is also followed in some countries. My question is which one is the correct way of doing it?
(1): Should the transformer Neutral and the transformer frame along with other substation equipment's/structures be interconnected and earthed in substation? or
(2): Should the transformer neutral and the frame be separately earthed and brought to the Main switchboard and interconnected via Link only at the Main switchboard? The neutral and the earth is not connected anywhere else.
I have seen lot of earthing done as per (1) and it seems (2) is also followed in some countries. My question is which one is the correct way of doing it?