victa1288
Electrical
- Apr 18, 2006
- 48
I am dealing with a ulitity company. I am doing a coordination settings for a pump station. Utility company is doing their own settings. They insist on using instantanneous settings for SEL587(Secondary of transformer). But their settings would make trip the whole pump station, which is not coordinated with downstream. Their argumanet is, they have to trip the transformer at a lower fault level as soon as possible to protect the personel because of arc flash. But nomally nobody is there. What can we do with this?
Thank you.
Thank you.