Hi All:
I am not a field service engineers or testing engineers so I have no ideas how long it will take a typical distribution LTC transformer (230/138/66 down to 12/25kV level) tap move from neutral position to the maximum boost tap position assuming 5 taps up and 5 taps down.
I read some Transformer notes that it may take 30 -45 seconds for a tap moving including mechanics and protection relay times to avoid mis action. However, what if the tap has to keep moving to the next say 4 steps untill the tap tap position. then will it still be 30-45 seconds for each tap or only 5 seconds for the rest taps without resetting voltage relay and timer mechanism for next tap moving.
One of our best guys told me after first tap moving with the voltage relay timer and tap energizing and mechanism, the Trx tap will only take 5 seconds for the rest taps which is pure tap energizing and mechanism time.
I know there are a lot of transformer experts here in this forum. I hope some experts can explain how the voltage relay timer settings were set in your utilities for the LTC plus if anybody has the recorded data would be appreciated.
THanks in advance!
I am not a field service engineers or testing engineers so I have no ideas how long it will take a typical distribution LTC transformer (230/138/66 down to 12/25kV level) tap move from neutral position to the maximum boost tap position assuming 5 taps up and 5 taps down.
I read some Transformer notes that it may take 30 -45 seconds for a tap moving including mechanics and protection relay times to avoid mis action. However, what if the tap has to keep moving to the next say 4 steps untill the tap tap position. then will it still be 30-45 seconds for each tap or only 5 seconds for the rest taps without resetting voltage relay and timer mechanism for next tap moving.
One of our best guys told me after first tap moving with the voltage relay timer and tap energizing and mechanism, the Trx tap will only take 5 seconds for the rest taps which is pure tap energizing and mechanism time.
I know there are a lot of transformer experts here in this forum. I hope some experts can explain how the voltage relay timer settings were set in your utilities for the LTC plus if anybody has the recorded data would be appreciated.
THanks in advance!