hasanmoulana
Petroleum
- Jun 9, 2011
- 37
My clients requirement is 10" swing check valve with A216 WCB body & Trim 1. I supplied valve with A216 WCB + 13% Cr for the trim. My client has rejected informing that he asked for trim 1 but I have supplied trim with A216 WCB + 13% Cr. Can any of you give me an idea how I can convince my client to make him accept the supplied valve