metaldork
Agricultural
- Mar 8, 2012
- 9
So I'm drafting up some process prints for a run of new tombstones we have in our shop. Aside from the surfaces being machined we are putting a dowel hole pattern on the faces. We are looking to control the location of these holes to the bottom and to the center of the tombstone, which I believe will be our primary and secondary datums. My question is what would be ideal for our third datum?