sigma1
Structural
- Jun 26, 2003
- 105
We have HSS20x8x3/8 member welded on top and bot with full penetration welds and approximately 75% of the webs(sides). Can this be considered a full moment connection?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.