Gasoline trim cooler (Material is ASTM A 179, Not A197) were was installed into My plant on 1979, from that year cooler just handle C5+, due to environment effect we installed MEROX System about 20 year ago
MEROX system were installed to clean gasoline from CO2 trough washing by Caustic process, after gasoiline mixed with Caustic, they are pass to the sand filter which we hope caustic will settle down after filteration, unfortunatly, some of caustic pass along with Gasoline were we could not predicted at all.
We are plan to replace tube material with better one were can handle above product.
Has the unit been in service continually for 32 years without being retubed? If it survived 12 years in the old process and 20 years in the new process without issue, I would retube with the same material.