Guys,
I am following up on this previous post:
Just to clarify, if we are welding a Section VIII division 1 heat exchanger that has a tube to tubesheet strength weld (partial or full), we do not need to qualify the procedure using a mock tubesheet with 10 tubes. If this is true, all we need to do to qualify this procedure, is to simply make a test coupon with the applicable dimensions and materials as if it was any other weld.
Please advise if my understanding is correct or advise if I am missing something. I could not find any reference to QW-193 in UG-20 and according to the post above, it does not exist.
I am following up on this previous post:
Just to clarify, if we are welding a Section VIII division 1 heat exchanger that has a tube to tubesheet strength weld (partial or full), we do not need to qualify the procedure using a mock tubesheet with 10 tubes. If this is true, all we need to do to qualify this procedure, is to simply make a test coupon with the applicable dimensions and materials as if it was any other weld.
Please advise if my understanding is correct or advise if I am missing something. I could not find any reference to QW-193 in UG-20 and according to the post above, it does not exist.