(1) During the turnaround then the units are completely steamed out and shutoff in a refinery setting, would we still need to observe area classification for bringing temporary (non classified) electrical equipment in the area?
(2) What about a situation where the units are shutoff and steamed out gradually. Can we bring temp (non classified) electrical equipment in that particular unit which is off however its adjacent units are live? What does CSA or NEC address this issue?
Thanks in advance for your help and comments.
(2) What about a situation where the units are shutoff and steamed out gradually. Can we bring temp (non classified) electrical equipment in that particular unit which is off however its adjacent units are live? What does CSA or NEC address this issue?