A new shell and tube heat exchanger (fixed tubesheet) with U-stamp received from fabricator shop. tube side design pressure 12 bar. Before installation at site, it was discovered that the manufacturer has used undersized bolts at girth flange for channel box up though the bolt holes were drilled for correct bolts size. There is plan to replace the bolts by dismantling channel and box it up with new gasket and correct size bolting. Gasket joint integrity will be checked by tube side pneumatic test at 2 bar.
Is above approach OK? Does this require approval of AI?