Hi guys, so far from the contract dwgs were denoted given loads/forces are unfactored. So, Do I need to use the ASD method?
And the reaction forces were not given, but the note says that connect all connections for 50% of UDL, Is this fine or Better to ask reaction force for each location as steel beam sizes are heavy.
Thanks in advance!!
And the reaction forces were not given, but the note says that connect all connections for 50% of UDL, Is this fine or Better to ask reaction force for each location as steel beam sizes are heavy.