One situation in two different projects:
1- Area under S.O.G.. Unsuitable soil was found and removed. The testing agency proposed filling with geotextile fabric with 57 stone. The Geotechincal Engineer rejected it.
2- Area under road. Unsuitable soil was found and removed. The testing agency proposed the same solution mentioned above. The Geotechnical Engineer accepted it.
I am confused. Could someone shed a light?
Thanks in advanced!!
1- Area under S.O.G.. Unsuitable soil was found and removed. The testing agency proposed filling with geotextile fabric with 57 stone. The Geotechincal Engineer rejected it.
2- Area under road. Unsuitable soil was found and removed. The testing agency proposed the same solution mentioned above. The Geotechnical Engineer accepted it.
I am confused. Could someone shed a light?
Thanks in advanced!!