Other than the cost and the fact that API 12F doesn't have a 1000 bbl tank, what other considerations should be reviewed when considering a 1000 bbl vs 500 bbl tank for a new upstream central tank battery?
Talking with these vendors, they'll build the 1000 bbl tank "to API 12F" criteria, so I assume for the moment they've got 4" nozzles and the same size thief hatch, etc. Why is it more folks don't use the 1000 bbl tanks?
(Of course, you can't integrate one of these into an existing facility so easily as it's higher. This is a new build.)
Thanks,
-Matt
PS I didn't see an Upstream/Midstream/Downstream forum on here. Did I miss them?
Talking with these vendors, they'll build the 1000 bbl tank "to API 12F" criteria, so I assume for the moment they've got 4" nozzles and the same size thief hatch, etc. Why is it more folks don't use the 1000 bbl tanks?
(Of course, you can't integrate one of these into an existing facility so easily as it's higher. This is a new build.)
Thanks,
-Matt
PS I didn't see an Upstream/Midstream/Downstream forum on here. Did I miss them?