I am currently supervising a multi story building that requires a shoring piles with 1meter diameter, 18 meters depth and 0.8 m distance b/n piles the contractors are pouring the concrete while there is water as high as 3 meters and without use of vibration they use admixture superplasticizer( pce) what is your thoughts