Hi Guys,
I just started a new job and came across a general practice here in the company which seems wrong to me.
We are doing simple integrity assessment and inspection planning for piping. In the software provided by the client it uses MAOP and DP to calculate the Remaining Life(s) then decide the inspection interval as per the max value. I have seen difference of as much as 8 MPa between the two pressures. In general MAOP is 10 to 15% lower than DP. Which means we are selecting lower minimum required thickness, specifying higher inspection intervals and higher remaining life for each.
I understand we could do that if we had a derating of the system or something along that lines , but I dont think we can apply this rule as a general rule to decide the minimum required thickness.
I have gone through the codes and could not find any clause which allows us to do that (use MAOP instead of DP) even if the client is allowing us. As far as i know the clients wants us to comply as per API 570 requirements as the piping is designed as per B31.3.
P.S. Could someone also explain to me who decides the MAOP?
I just started a new job and came across a general practice here in the company which seems wrong to me.
We are doing simple integrity assessment and inspection planning for piping. In the software provided by the client it uses MAOP and DP to calculate the Remaining Life(s) then decide the inspection interval as per the max value. I have seen difference of as much as 8 MPa between the two pressures. In general MAOP is 10 to 15% lower than DP. Which means we are selecting lower minimum required thickness, specifying higher inspection intervals and higher remaining life for each.
I understand we could do that if we had a derating of the system or something along that lines , but I dont think we can apply this rule as a general rule to decide the minimum required thickness.
I have gone through the codes and could not find any clause which allows us to do that (use MAOP instead of DP) even if the client is allowing us. As far as i know the clients wants us to comply as per API 570 requirements as the piping is designed as per B31.3.
P.S. Could someone also explain to me who decides the MAOP?