Jan 18, 2010 #1 mlmaclean Industrial Dec 14, 2009 4 0 0 CA Has anyone used the resource function to manage tooling requirements in their project. If so, was it organized using the material option or Work? Thanks!
Has anyone used the resource function to manage tooling requirements in their project. If so, was it organized using the material option or Work? Thanks!
Feb 9, 2010 #2 ahlix Civil/Environmental Feb 8, 2010 1 0 0 GH i think it depends on how the tool is used it could be work with a fixed plus variable rate or either of the two it can also be a cost resource As a material i think you need to very ingenious to figure out a a label and cost for it Upvote 0 Downvote
i think it depends on how the tool is used it could be work with a fixed plus variable rate or either of the two it can also be a cost resource As a material i think you need to very ingenious to figure out a a label and cost for it