Has anyone used the resource function to manage tooling requirements in their project. If so, was it organized using the material option or Work?

Thanks!
 
Replies continue below

Recommended for you

i think it depends on how the tool is used it could be work with a fixed plus variable rate or either of the two
it can also be a cost resource
As a material i think you need to very ingenious to figure out a a label and cost for it
 