Electricalboy123
Electrical
- Apr 14, 2010
- 2
A company that I am going to be working in soon has reduced output significantly on its production lines and a number of production buildings within the facility have been closed indefinitely.
The output is currently 50% below peak and a three shift operational cycle has been reduced to two shifts (the night shift has been suspended).
The plant is also operating over 5 days as opposed to the 7 days that it was designed for.
What factors could be considered to obtain maximum utilization of electrical energy within the plant and the effects this might have on performance.
Additional Information:
Using large thermal process (Boiler for production)
A number of production plants within the facility have been shut down indefinitely.
There is one centralised compressed air facility designed for full operation.
Power factor correction has been designed to load.
The facility is fed by a parallel 20Kv feeders from the grid for supply security.
Any help would be greatly appreciated as this is not really my area of expertise but I need to
get my head around it quickly an. Much Thanks
The output is currently 50% below peak and a three shift operational cycle has been reduced to two shifts (the night shift has been suspended).
The plant is also operating over 5 days as opposed to the 7 days that it was designed for.
What factors could be considered to obtain maximum utilization of electrical energy within the plant and the effects this might have on performance.
Additional Information:
Using large thermal process (Boiler for production)
A number of production plants within the facility have been shut down indefinitely.
There is one centralised compressed air facility designed for full operation.
Power factor correction has been designed to load.
The facility is fed by a parallel 20Kv feeders from the grid for supply security.
Any help would be greatly appreciated as this is not really my area of expertise but I need to
get my head around it quickly an. Much Thanks