Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

UW-3 Weld joint category

Status
Not open for further replies.

vinothsvk

Mechanical
May 19, 2016
27
Dear all,
I need some clarification on UW-3 weld joint category. what type of category at the location of nezzle neck connecting with flange(W.N.R.F - weld neck raised face)

Thank you all.
 
Replies continue below

Recommended for you

Nozzle to flange weld would be a cat. C regardless of flange connection type.
 
Thank you Mr.A.I.BP.

I have another doubt on radiography. As per ASME Section VIII Div-I UW-11 (a)(4), category B and C welds in nozzles that neither exceed NPS 10 nor 29mm wall thickness do not require any radiographic examination. Recently i reviewed one mechanical GA drawing for surge vessel. In which, 16inch nozzle connected with main shell. But fabricator state that full radiography should be given on category C welds in nozzle and if radiography is not accessible 100% UT should be given. Please clarify which statement is correct?
 
There are quite a few variables determining how much and what level of ndt to use. I might be misunderstanding but an xray of a nozzle to shell joint (cat. D) would be not impossible but impractical and ultrasound would be more fitting due to the geometry of the joint. A weld neck flange (cat. C butt weld) would be "easier" to preform.
 
Sir, i need clarification on category C weld in nozzle. In my understanding the nozzle size is grater 10 inch or 29mm wall thickness, radiography is not required on category C weld in nozzle.

My understanding is correct or not. Please clarify me.
 
vinothsvk, Category C joints may be exempted from both full and spot RT requirements if not exceeding NPS 10 or 1 1/8 inch thickness, under UW-11(a)(4) or UW-11(b).

NPS 16 exceeds (is larger than) NPS 10.

Regards,

Mike

The problem with sloppy work is that the supply FAR EXCEEDS the demand
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor