My water supply for a land development project is described below:
Potable water supply from a 18 in. aqueduct
For 2 weeks per year during maintenance, positive suction is 15 - 20 psi
For 50 weeks per year, positive suction is 90 - 120 psi
Discharge head is 160 psi, discharging directly into a potable water reservoir
Initial minimum discharge is 475 USgpm (first 2 years or so), but since I'm only filling a tank once a day, this can be done in a shorter period at higher flow
Ultimate discharge (about year 6) is 1650 USgpm
I was going to use 1 pump initially (with one back-up pump on standby), with a second and third added in years 2 and 4
My pump suppliers tell me that due to the range in suction conditions, variable speed drives is the only way it can be done.
Can anyone think of another way?
Also, re the piping layout, I initially laid it out with suction and discharge headers in the station and the pumps between them, all in one plane. I've since thought more about putting the discharge manifold above the suction manifold to economize space. Are there any drawing resources available showing different station lay outs which I can have a look at?
Thanks.
My water supply for a land development project is described below:
Potable water supply from a 18 in. aqueduct
For 2 weeks per year during maintenance, positive suction is 15 - 20 psi
For 50 weeks per year, positive suction is 90 - 120 psi
Discharge head is 160 psi, discharging directly into a potable water reservoir
Initial minimum discharge is 475 USgpm (first 2 years or so), but since I'm only filling a tank once a day, this can be done in a shorter period at higher flow
Ultimate discharge (about year 6) is 1650 USgpm
I was going to use 1 pump initially (with one back-up pump on standby), with a second and third added in years 2 and 4
My pump suppliers tell me that due to the range in suction conditions, variable speed drives is the only way it can be done.
Can anyone think of another way?
Also, re the piping layout, I initially laid it out with suction and discharge headers in the station and the pumps between them, all in one plane. I've since thought more about putting the discharge manifold above the suction manifold to economize space. Are there any drawing resources available showing different station lay outs which I can have a look at?