I have a project that requires the building to be 2.5 pa and 5 pa (on other area)higher than the atmosphere. but due to large amount of exhaust air, I am hving difficulty to meet the requirement.
some proposes to add extra amount of air on AHU serving the area by getting some air from outside AHU (fresh Air AHU). my problem is, how can this extra air, which is not considered on design be handled by the VAV's connected to the system?
Your input would highly be appriciated....
some proposes to add extra amount of air on AHU serving the area by getting some air from outside AHU (fresh Air AHU). my problem is, how can this extra air, which is not considered on design be handled by the VAV's connected to the system?