I have searched on this and found some discussion, but I am curious as to what anyone has found to be a good solution to the problem. In my case, I had a new 200HP motor/pump setup(pumping chilled water) that the bearings failed after about 6 months. The motor is fed by a new IGBT VFD. A single ground wire initiating at the source is run straight through to the motor and grounded at the termination box. There are currently no chassis grounds.
I have found much discussion online, particularly a white paper by Reliance Motor, but I was looking for some real solutions that have worked.
Right now we are looking at a ring assembly sold by a company called Shaft Grounding Systems. I am also considering adding some chassis grounds, and/or refeeding the motor from the VFD with continuously corrugated cable.
Any input is welcome.
I have found much discussion online, particularly a white paper by Reliance Motor, but I was looking for some real solutions that have worked.
Right now we are looking at a ring assembly sold by a company called Shaft Grounding Systems. I am also considering adding some chassis grounds, and/or refeeding the motor from the VFD with continuously corrugated cable.
Any input is welcome.