vollEngineer
Geotechnical
- Jun 25, 2004
- 44
One of my colleagues asked me this: School wants to put a retaining wall footing 6 inches above an existing sewer pipe. He already tried the "move the wall" recommendation. They are expanding the footing to reduce pressure on the pipe. Currently, they have 5-7 stone over the pipe. Colleague wonders if 6 inches of loose-ish sand will protect the pipe. Anyone have a cheap (school) way of protecting that pipe? Anyone used any other materials? Styrofoam?