- May 9, 2014
- 206
We have a warehouse with light forklift traffic and a Contractor that has a lot of experience and success with placing 6 inch slabs, unreinforced and control joints at 12.5' oc without dowels with other engineers.
I'm fine with the plain concrete and joint spacing, but in my experience, I've always provided dowels for load transfer with wheeled traffic.
For the life of me, i cant find a reference for eliminating dowels for this type of loading. Does anyone have a reference or any helpful hints?