BCMIENG
Mechanical
- Aug 25, 2019
- 4
We are jacking up floor trusses in a 3 story wood frame condo 32 years old. Trusses under a bay cantilevered over a concrete bearing wall are sagging up to 2 inches. Also, two internal trusses are sagging up to 1.5 inches between the cross beam and the bearing wall. Structural Engineer has determined the fix which is LVLs nailed to trusses. Contractor wants to jack up the trusses all at once. I want to jack up in 1/8 inch or 1/4 inch increments at intervals of three days or a week to minimize drywall cracking, doors not opening, window popping, etc.. Could anyone recommend jacking-up intervals and procedures? It would be greatly appreciate. Thanks.