I have an a/c inspector asking me to include the weight of the wiring for a new system installation. Is this a practice that has ever been followed before? If so where do you chose the moment arm? The center of the wiring run? To me you would just re-weigh the a/c.
Thoughts?
I have an a/c inspector asking me to include the weight of the wiring for a new system installation. Is this a practice that has ever been followed before? If so where do you chose the moment arm? The center of the wiring run? To me you would just re-weigh the a/c.
Thoughts?