albanyYEM
Structural
- Feb 17, 2015
- 20
I have detailed a welded moment connection between steel column and beam flanges with backing bars. I have also shown for the backing bars to be removed and the welds to be back gouged and re-welded as necessary. However I'm thinking this is overkill as the project has been designed with R=3. Therefore I am entertaining leaving the backing bar in place. My question is this: Is the backing bar required to be removed for verification/testing of such a weld or is it ok to leave in place if this is a joint not specifically detailed for seismic resistance with R=3?