I'm trying to reduce the deflection in an already installed steel member by welding another member to the top.
If I calculate my spacing based on shear flow I find that need 1" of 1/4" fillet every 60".
I'm assuming that to created the rigid member I desire I will need to do welds more often than that, but I'm not sure how to determine that.
Any suggestions?
If I calculate my spacing based on shear flow I find that need 1" of 1/4" fillet every 60".
I'm assuming that to created the rigid member I desire I will need to do welds more often than that, but I'm not sure how to determine that.