Gents ,
As per ASME Section IX ,QW -322,when welder has not welded with a process during a period of 6 months or more his qualifications for that process shall expire: unless within the 6 month period , prior to his expiration of qualifications .In my project welder is qualified in GTAW process with F number 6 (F6) & F number 43 (F43).As per ASME IX continuity is renewed based on the process welded .My Question is during the continuity renewal time whether separate joint NDT report is needed for F6 & F43 ,Because F number is essential variable for welders .???
Regards,
PJ
As per ASME Section IX ,QW -322,when welder has not welded with a process during a period of 6 months or more his qualifications for that process shall expire: unless within the 6 month period , prior to his expiration of qualifications .In my project welder is qualified in GTAW process with F number 6 (F6) & F number 43 (F43).As per ASME IX continuity is renewed based on the process welded .My Question is during the continuity renewal time whether separate joint NDT report is needed for F6 & F43 ,Because F number is essential variable for welders .???
Regards,
PJ