hdpinsp
Petroleum
- Nov 11, 2013
- 5
Need to weld attachments to the inside of the pressure vessel (to the shell) the attachments are internals support. Vessel has been in service for approx. 9 mos, found problem during shutdown. Can these fillets weld be made with out a hydro-test? If so which code governs and is an AI responsible for this approval?