tonnesen
Mechanical
- Jan 30, 2012
- 10
Hello,
We are going to weld a SA-350 LF2Cl1 nozzle neck to a SA-516 gr 70N head. As I never worked with forgings, I was reading the SA-350 and found that the piece will be normalized and tempered or quenched and tempered, based on this I would like to know if after welding the nozzle neck to the head I will have to PWHT in a temperature just below the original tempering temperature of the nozzle neck (like in quenched and tempered materials), in order to re-temper it after welding or if this PWHT is only determined by UCS-56/UW-40 requirements.
Thank you all.
We are going to weld a SA-350 LF2Cl1 nozzle neck to a SA-516 gr 70N head. As I never worked with forgings, I was reading the SA-350 and found that the piece will be normalized and tempered or quenched and tempered, based on this I would like to know if after welding the nozzle neck to the head I will have to PWHT in a temperature just below the original tempering temperature of the nozzle neck (like in quenched and tempered materials), in order to re-temper it after welding or if this PWHT is only determined by UCS-56/UW-40 requirements.
Thank you all.