dakota99
Structural
- Feb 23, 2005
- 21
I am just wondering how many of you out there allow contractors to wet stick foundation dowels. I generally allow typical foundation wall dowels to be pushed into place but always require retaining walls to have all rebar tied in place. I have run into a situation where the contractor placed dowels for a retaining wall after pouring the concrete for the footings A.K.A. wet sticking the dowels. I have since required the contractor to epoxy additional rebar into the tension side of the wall to ensure proper bond is achieved. Of course holy hell broke loose and I am the only engineer that does not allow wet sticking dowels on retaining walls. The state building inspector has also taken sides with the contractor. am I being too conservative here.