PeteratPSP
Aerospace
- May 9, 2011
- 3
We are a contract manufacturer and I run into the same issue over and over.
What is the minimum chamfer allowance on a drawing callout for (No Chamfer)
Is there a measurable and or standard?
What is the minimum chamfer allowance on a drawing callout for (No Chamfer)
Is there a measurable and or standard?