- Oct 12, 2006
- 8
I am in hawaii and need to make a road through steep jungle with large and small boulders. The road from lot "A" (bottom) to lot "B"(top) has an elevation change of about 45 feet and the distance is about 135 feet.There is about 40 feet in width to work with. I want to keep it legal(permits, etc.) and keep costs down. What is the process to get this project off the ground properly and quickly?