babyfatface
Mechanical
- Jan 13, 2006
- 15
- 0
- 0
What is the rule for adding a reinforced pad when specify a pipe shoe?
Project requires 6” above using reinforced pad same thickness as pipe . I would like to know the reason behind that.
Project requires 6” above using reinforced pad same thickness as pipe . I would like to know the reason behind that.