Hi
The formula used in this thread utilizes SMYS as allowable stress.
Our small utility designs every pipeline to operate below 30% SMYS should I use the 30% value or the allowable stress of the pipe, x52
This thread has been very helpful, I am trying to predermine a trench profile, prior to a rock breaking tender.
Thanks