Re the refomer unit, there is waste heat boiler at the reformer outlet to recover energy from process gas for a steam generation. But, one or 2 years later this waste heat boiler should be opened in order to inspect and clean because of its' loss of performance. This unwanted WHB cleaning, forced us go to shut-down every one or two years. If any body experienced and solved this kind of trouble, please let me know the reason and countermeasure.
And, if you guys inform me turn-around interval(for example 3 or 4 years) of your own experience, it would be very helpful.
For your reference, mentioned unit is steam reformer and followed by PSA unit to supply H2 to the hydrotreating unit with the capacity of 100,000 Nm3/Hr production(H2 99.99%). And, our feed stock was "treated C5/C6 naph" from Naph. HDS.
And, if you guys inform me turn-around interval(for example 3 or 4 years) of your own experience, it would be very helpful.
For your reference, mentioned unit is steam reformer and followed by PSA unit to supply H2 to the hydrotreating unit with the capacity of 100,000 Nm3/Hr production(H2 99.99%). And, our feed stock was "treated C5/C6 naph" from Naph. HDS.