I'm preparing a SWPPP for a project at the base of the Coast Ranges in Northern California. A tributary area of 40 acres drains to a storage tank site conveniently located in the little valley's flow channel, and we want to build a second tank on the same site. The new site when finished will be 5 acres. Using the state's RUSLE calculator the Total Predicted Sediment Loss is 117.1 tons per acre which is classed a High Sediment Risk. Surface soils per the geotech report are fat to lean clays (CL), silt (ML), clayey silt-silty clay (ML-CL). While I'm specifying the erosion and sediment control BMPs, the run-on is being routed around and through the site as much as possible, and the run-on and runoff are being conveyed away by an existing drainage channel, I have 3 good places to trap sediment if I need to. The CASQA BMP for Sedimentation Basins (SE-2) says they should be considered for use at the outlet of disturbed watersheds between 5 and 75 acres and evaluated on a site-by-site basis. Can anyone suggest the considerations I should use to make such a determination? Thanks for your input.