Bowsers
Structural
- Nov 19, 2019
- 35
Hello,
Sorry for such an entry level questions. I did a forum such but nothing came up of use.
I am curious when a detail is required. What, in general, should be signaling to me that a detail is required?
Secondarily, if a detail is required, when is it ok to specify a prescriptive detail vs. drawings one up?
Thanks
Sorry for such an entry level questions. I did a forum such but nothing came up of use.
I am curious when a detail is required. What, in general, should be signaling to me that a detail is required?
Secondarily, if a detail is required, when is it ok to specify a prescriptive detail vs. drawings one up?
Thanks