engr2GW
Petroleum
- Nov 7, 2010
- 307
Hi,
The kind of wellhead I see/work around is typically a 200'-500' by 200'-500' pad and inside it are wellheads flowing to high or low pressure gravity separators, gad production unit (which is a pack of indirect line heater connected to a horizontal separator), heater treaters (emulsion treaters), and then gas flowing from the afore mentioned to the gas meter then to the gas gathering lines. The water flows to the water tanks and the oil flows to the oil tanks. We may sometimes have compressors for VRU, flash gas, booster, or gas lift.
My thought is, although ASME B31.3 is for refineries and chemical plants, it is the piping code that best applies to the production pad described above, and then the lines outside the pad for gas and liquid gathering can be goverened by ASME B31.8 and B31.4 respectively because these are only for pipeline/gathering lines?
Is that a good assigning of the pressure piping code? If not, is there any other pressure piping code that best applies to the production pad described above?
Thanks a lot.
The kind of wellhead I see/work around is typically a 200'-500' by 200'-500' pad and inside it are wellheads flowing to high or low pressure gravity separators, gad production unit (which is a pack of indirect line heater connected to a horizontal separator), heater treaters (emulsion treaters), and then gas flowing from the afore mentioned to the gas meter then to the gas gathering lines. The water flows to the water tanks and the oil flows to the oil tanks. We may sometimes have compressors for VRU, flash gas, booster, or gas lift.
My thought is, although ASME B31.3 is for refineries and chemical plants, it is the piping code that best applies to the production pad described above, and then the lines outside the pad for gas and liquid gathering can be goverened by ASME B31.8 and B31.4 respectively because these are only for pipeline/gathering lines?
Is that a good assigning of the pressure piping code? If not, is there any other pressure piping code that best applies to the production pad described above?
Thanks a lot.