hi,
im my working plant want to new design clinker unloading system with precision train unloading.and then ? need transporting system espically belt conveyor system but which one the test solution close belt conveyor or conventional belt system straigt line lenght 290 meter inclined 2-3 degrees must be ona part directly transporting unloading silo? which one select the best choise?
REGARDS,
SCOLF?ELD
im my working plant want to new design clinker unloading system with precision train unloading.and then ? need transporting system espically belt conveyor system but which one the test solution close belt conveyor or conventional belt system straigt line lenght 290 meter inclined 2-3 degrees must be ona part directly transporting unloading silo? which one select the best choise?