pristava
Industrial
- Jan 8, 2004
- 53
Who is doing Protection Coordination Study here in Southern Ontario Canada.
System what we have is very small 5-6 nodes only, and we have to coordinate 5KV fuses with 600Volts MCCB's.
Thanks.
bobziva@yahoo.com
System what we have is very small 5-6 nodes only, and we have to coordinate 5KV fuses with 600Volts MCCB's.
Thanks.
bobziva@yahoo.com