qcrobert
Industrial
- Jun 24, 2010
- 229
In the title block of the tank drawing it states the engineer that:
Drawn By: MG
Checked By: LPJ
Approved By: KPS
Which of these persons is considered the EOR?
Appreciate your comments,
RobertP
Drawn By: MG
Checked By: LPJ
Approved By: KPS
Which of these persons is considered the EOR?
Appreciate your comments,
RobertP