I have a client who has fee simple ownership of a piece of property. The city has a stormwater maintenance easement on part of it to install, maintain, operate an repair a regional underground detention system. City's excavation will be around 20,000 cy to install detention. Excavated material is contaminated. Who owns the excavated material?