wdc
Civil/Environmental
- Jul 26, 2001
- 4
How long must a concrete pile cap be covered when temps range from 10 - 25 degrees. Size is approx 3-6 x 4-0 x 3' deep. from above grade. Also when pouring concrete wall in temps of about 40 degrees and temps drop to 20 degrees at night is heat needed or can the wall be covered with blankets if so how long for each