jccgrace
Structural
- Oct 19, 2005
- 1
I just get a job to review the structural capacity of a one way concrete slab of a Bew York city building, built in 1960. The major reinfocement is wire mesh 5 6 3 4-1/2. I need to know what is the meaning of 5 6 3 4-1/2 ?
Thanks.
Jccgrace
Thanks.
Jccgrace